(This page is updated as roadway conditions change. This is the most current information.)

 

DATE/TIME      LOCATION STATUS ROUTE  REASON
Until Further Notice
Daily
M- Sun
24 Hours
Ortega Ridge Road LANE CLOSURE
SINGLE TRAVEL LANE
Ortega Ridge Road (800' East of Greenwell Avenue) Roadway Settlement - The road is open to stop‐controlled, alternating use of a single travel lane, with channelizes delineating the area of greatest subsidence.
Mar 2017
M-F
7:30 am to
4:00 pm
Patterson Avenue Advisory 500 Patterson Avenue Residential Tract Development Tree Farm Project, Traffic Control
Mar 2017 
M-F
7:30 am to
3:30 pm
El Colegio Road Intermittent Traffic Control

El Colegio Road & Storke Road
Isla Vista
Road Improvements & Traffic Signals, UCSB Housing Development -
Contractor will be working on turnpocket median @ Camino Corto & Lights @ Storke & El Colegio.
Mar 2017
M-F 
7:30 am to
4:00 pm
Via Los Santos      Advisory 4700 Via Los Santos
Santa Barbara
Sub-Division Improvements Boulder Project, Traffic Control
Mar 2017
M-F 
7:30 am to
4:00 pm
Patterson Avenue Advisory 533 Patterson Avenue (North of University Dr)
Santa Barbara     
Residential Tract Development Knoll Project, Final Inspection
Traffic Control
Mar 2017 
M-F
7:30 am to
4:00 pm
State Street Advisory 4111 State Street
Santa Barbara
Development Improvements; Traffic Control
Mar 2017
M-F
8:00 am to
4:00 pm
Auhay Drive Advisory      4575 Auhay Drive at Arroyo Rd
Santa Barbara
Residential Tract Development Project
Mar 2017
M-F
7:30 am to 
4:00 pm
Los Feliz Drive LANE CLOSURE 469 Los Feliz Drive Sewer Lateral Replacement
March 28-31, 2017
Tue-Fri
7:30 am to
5:00 pm
Hollister Avenue Intermittent Traffic Control Hollister Avenue between Auhay Drive & Nogal Drive
Santa Barbara
Utility Potholing Work - Phase 1

Utilizing shoulders & travel lanes to conduct work
March 27, 2017
Monday
8:00 am to 
4:30 pm
Las Perlas Drive Intermittent Traffic Control Las Perlas Drive
Goleta
Potholing
March 27, 2017
Monday
8:00 am to 4:00 pm
Camino Molinero LANE CLOSURE 4544 Camino Molinero at Camino Del Rio
Santa Barbara
Replace Existing Power Pole
March 27, 2017
Monday
8:00 am to 4:00 pm
East Mountain Drive LANE CLOSURE 130 East Mountain Drive
Montecito
Replace Existing Power Pole
March 28, 2017
Tuesday
8:00 am to 
5:00 pm
East Mountain Drive LANE CLOSURE 298 East Mountain Drive
Montecito
Replace Existing Power Pole
March 29-31, 2017
Wed-Fri
8:00 am to 
4:00 pm
Hollister Avenue LANE CLOSURE 4699 Hollister Avenue Install New Wall Lateral
         
Jan-May 2017
Daily
Sandspit Road
Goleta Beach
Advisory use Caution Goleta Beach Enterance - Sandspit Road
Goleta
Goleta Beach Bridge Replacement Project, 
WEATHER PERMITTING

Biologist to perform Nest Survey.
Contractor will resume work May 1, 2017.
North County Closures
Date / Time Location Status Route Reason
Mar 21, 2017 7:00am until April 17, 2017 Black Road Closure From Betteravia Rd to Mahoney Rd Construction
Feb 19, 2017 6:45pm Lompoc-Casmalia Rd Closure From Bishop Rd to San Antonio Rd Large Shoulder Slip-out
10am 3/7/17 Ballard Canyon Road Single Lane Subject to single lane at 2968 Ballard Canyon shoulder slip out
5:30pm 2/17/17 San Miguelito Canyon Road Residents Only San Miguelito Canyon Road at Lompoc City Limits Road Undermining
5:30pm 2/17/17 Alisal Rd Closed Alisal road at City of Solvang limits and at Nojoqui Park        
11:30 am on 2/17/17 North Refugio Rd Closure 246 Just South of Santa Ynez River Flooding
Feb 14, 2017 3:45pm Orcutt-Garey Rd Closure From Dominion to Foxen Canyon Rd. Large Shoulder Slipout
Daily
M- Sun 
24 Hours
Refugio Road CLOSURE Refugio Rd (Dirt section) Closed to ALL traffic on Santa Ynez side

West Camino Cielo Rd (top of mountain) to 4.3 miles south of Highway 246
Damage to Road
         
Mar 2017
 M-F
7:00 am to
4:00 pm
First Street Intermittent Lane Closure First Street Orcutt Residential Tract Development Stonegate
Mar 2017
M-F
7:00 am to
4:00 pm
Rice Ranch Road Intermittent Lane Closure Rice Ranch Road
Orcutt
Residential  Development Utility Service Connections, concrete repair & landscaping in various locations
Mar 2017
M-F 
7:00 am to 
4:00 pm
Club House Court Intermittent Lane Closure Club House Court
Vandenberg Village
Residential Tract Development - Club House Estates

Punch List items
Mar 2017 
M-F 
9:00 am to
3:00 pm
Bradley Road     Intermittent Lane Closure Bradley Road
Orcutt
Residential Development - all work within fenced Tract boundaries - Trucks entering Bradley Road
Mar 2017
M-F
7:00 am to
4:00 pm
Black Road Intermittent Traffic Control Black Road
Santa Maria
North County Jail Project
Utility installations & road improvements
Mar 2017
M-F
7:00 am to 
4:00 pm
Bell Street Intermittent Lane Closure 490 Bell Street
Los Alamos
Frontage Improvements on Helena St & Bell St (HWY 135)
Mixed Use Development - Los Alamos Hospitality Group
Mar 2017
M-F
7:00 am to 
4:00 pm
Ranch Ranch Road Intermittent Lane Closure Rice Ranch Road
Orcutt
Oil Pipeline Removal 
Mar 2017 
M-F 
7:00 am to 
4:00 pm
Kirschenmann Road Intermittent Lane Closure Kirschenmann Road
Cuyama
Cuyama Solar Array Project
Frontage Improvements
Mar 2017 
M-F
7:00 am to
4:00 pm
Sanja Cota Avenue Intermittent Lane Closure Sanja Cota Avenue Punch List work on Sanja Cota Avenue, Chumash Casino, Santa Ynez
         
 