The Santa Barbara County Flood Control & Water Conservation District provides for the control of flood and storm waters countywide as well as the conservation of such waters for beneficial and useful purposes. The Design Section of the Flood Control District designs and performs construction contract administration for flood control capital improvement projects located throughout the County. In addition, the Design Section addresses disaster rehabilitation and routine maintenance rehabilitation projects.


To View Current Projects out to Bid, Click here 


Photos of past Flood Control Projects 

Carpinteria Salt Marsh Enhancement Project (Carpinteria) 

Carpinteria Salt Marsh Wall Extension (Carpinteria)

Montecito Creek Debris Basin (Montecito)

El Encanto Debris Basin (City of Santa Barbara)

Lower Mission Creek UPRR Culvert (City of Santa Barbara)

Lower Mission Creek - Reach 1A, Phase 1 (City of Santa Barbara)

Lower Mission Creek - Reach 2B, Phase 1 (City of Santa Barbara)

Montecito Creek Fish Passage Improvements (Montecito)

West Green Canyon Storm Drain Project (Santa Maria Valley)

West Side Storm Storm Drain Phase II (City of Santa Barbara)

Via Rueda Interceptor Storm Drain Phase I (Santa Barbara)

Via Rueda Interceptor Storm Drain Phase II (Santa Barbara)

Gobernador Debris Basin (Carpinteria)

Cheltenham Storm Drain (Santa Barbara)

North Avenue Storm Drain (City of Lompoc)

Santa Maria River Levee Reinforcement Project (Santa Maria)

 

Design Carpinteria Salt Marsh

 Carpinteria Salt Marsh Enhancement Project
Back to List

 

Design Carp Marsh Wall Extension

Carpinteria Salt Marsh Wall Extension
Back to List



Montecito Creek Debris Basin Photo

Montecito Creek Debris Basin
Back to List 

 

El Encanto Debris Basin Photo

El Encanto Debris Basin
Back to List

 

Design LMC Railroad Culvert

Lower Mission Creek UPRR Culvert - joint project with the Army Corps of Engineers and Union Pacific Railroad
Back to List

 

Design LMC 1A-1

Lower Mission Creek - Reach 1A, Phase 1 - joint project with the Army Corps of Engineers
Back to List 

 

Design LMC 2B-1

Lower Mission Creek - Reach 2B, Phase 1 - joint project with the Army Corps of Engineers
Back to List



Design Montecito Fish Passage

Montecito Creek Fish Passage Improvements
Back to List

 


West Green Canyon Storm Drain Photo

West Green Canyon Storm Drain Project
Back to List 



West Side Storm Drain

West Side Storm Drain Phase II
Back to List

 Via Rueda I

Via Rueda Interceptor Storm Drain Phase I
Back to List

 Via Rueda II

Via Rueda Interceptor Storm Drain Phase II
Back to List

 Gobernador

Gobernador Debris Basin Modification
Back to List



Design Cheltenham Storm Drain

Cheltenham Storm Drain
Back to List
 

Design North Ave Storm Drain 

North Avenue Storm Drain
Back to List


Design Santa Maria River Levee Reinforcement

Santa Maria River Levee Reinforcement Project - joint project with the Army Corps of Engineers
Back to List